packsysengineering.packsys.sr.Zum Inhalt packsysengineering.packsys.sr.Zum Inhaltsverzeichnis packsysengineering.packsys.sr.Zur Hautpnavigation
Brueckner Group India Private Limited
Menu
Home
  • Engineering Design
  • Technical Documentation
  • Digital Services
  • Global Sourcing and Supply Chain Management
  • About us
  • Platform companies
  • Locations
  • Get in touch
  • News
  • Events
  • Initiative "Yes, we care"
Brueckner Group India Private Limited
Venus Building, 3rd Floor, Plot no 8A, Kalwa MIDC Block
Thane Belapur Road, Navi Mumbai – 400708
India
+91 22 6167 4800
info@brueckner-india.com
  • Close
    Brückner Group SE
    LEADING
    TO
    SUCCESS
    Find out
    Brückner Maschinenbau GmbH
    STRETCHING
    THE
    LIMITS
    Find out
    Brückner Servtec GmbH
    SERVING
    YOUR
    SUCCESS
    Find out
    KIEFEL GmbH
    DRIVING
    YOUR
    PERFORMANCE
    Find out
    PackSys Global AG
    CREATING
    PACKAGING TECHNOLOGY
    Find out
    Further information
  • Career
  • Close

    Search

    What are you searching for?

Table Of Content
    Latest news from PackSys Global Group
    1. PackSys Engineering
    2. News
    3. Joint project: New building Waldau by PackSys Global AG and Combitool AG in Rüti on Spitalstrasse
    Follow us:

    Joint project: New building Waldau by PackSys Global AG and Combitool AG in Rüti on Spitalstrasse

    23 Aug 2019

    The ground-breaking ceremony on August 23, 2019 marks the beginning of the new joint future of PackSys Global AG and Combitool AG. 

    The new building project Waldau at the Spitalstrasse in Rüti has now made an important step forward. Once all the permits have been received, construction can begin.

    On August 23 August, 2019, the ground-breaking ceremony took place with representatives of the municipality of Rüti, the neighbours, the architect Andreas Volk and the management of the parent company of the Brückner Group, as well as the management of PackSys Global AG and Combitool AG.

    The new production and engineering site will make an important contribution to maintaining and creating highly qualified jobs in Rüti.

    Some interesting key data on the new building:

    • Start of construction in September 2019 and expected move in June 2021
    • Inner courtyard (atrium)
    • Zoning country 17,000 sqm, of which 8,047 sqm will be built over: Assembly area 4,065 sqm, operating area 7,443 sqm, office space 3,412 sqm
    • Cubic capacity according to SIA 138,213 m3
    • 60% renewable energy
    • The photovoltaic system produces 43,600 kW per year, which corresponds to own requirements
    • 99 car parking spaces and 70 bicycle parking spaces
    • Electric charging station for cars and bicycles
    Groundbreaking of Waldau building
    People listening to presentation
    Rendering PackSys Global new building Waldau
    Excavatorin the green
    shovel and helmets in front of excavator

    More News

    This might be interesting for you as well

    PackSys Global Engineering Services
    • Engineering Design
    • Technical Documentation
    • Digital Services
    • Global Sourcing and Supply Chain Management
    Brückner Group
    • Brückner Group Headoffice
    Services and Contact
    • e-Portal
    • Get in touch
    • Locations
    Find us here
    Brueckner Group India Private Limited
    © Copyright 2025 Brueckner Group India Private Limited